Austin Community College - Start Here. Get There.Welcome to ACC's Building Construction Technology
ApplyScheduleRegister
Austin Community College
5930 Middle Fiskville Rd.
Austin, Texas 78752-4390
512.223.4ACC (4222)
CRPT 1445 Conventional Interior Finish Systems photos

Photos of another Conventional Interior Finish Systems class at work

The Cabinet Making II class installed the kitchen cabinets in this building. After adding insulation and sheetrock, this Conventional Interior Finish Systems class installed the countertop that the Concrete I class made and installed a wood laminate floor in the bedroom.

As part of the finishing process, students sand the countertop...

...and the cabinets before sealing the countertop and varnishing the cabinets.

Next they work on the ceramic tile back splash. One student applies the paste while the other adds the tiles.

The instructor demonstrates how to cut the ceramic tiles with a wet saw...

...and the cut tile is added around the outlet for the light switch.
Meanwhile other students apply glue and begin laying the wood laminate floor in the bedroom.
This class also finished the window and door trim (this is a bathroom window - note the green sheet rock, used in humid areas)
 

 

 

.
Future StudentsCurrent StudentsFaculty and StaffCommunity and BusinessNewsroomA-Z Index