Riverside Renovation Photos
The Building Construction Technology's Riverside campus renovation project is complete. The masonry lab, classrooms, offices, tool rooms and storage areas - in short, everything except the two woodworking labs - were demolished and rebuilt to current building, college and accessibility code standards.
Here are some photos of the finished campus
Two doors - one for the woodworking lab (right) and one for the classrooms and offices
The front woodworking lab hasn't changed much
...nor has the back woodworking lab, except that the the tools are stored where the big doors used to be......
...and the student project storage area is arranged differently.
When going to the classrooms (seen from the kitchen looking towards the front door)...
...students pass the faculty offices; one of them looks onto the front woodworking lab.
There's a small kitchen for students and faculty to use.
There are still two classrooms, a small one for lecture classes...
...and a larger one for classes that require more space.
The masonry lab for concrete classes is also brand new
...and has two work areas. The smaller one has a sink...
...and the larger room has plenty of space and work bench areas.