Photos of the electrical labs | Photos of the HVAC labs
For the plumbing, students run Pex (polyethylene) tubing through the building. Blue Pex is for cold water, red is for hot water. Separate lines are run from the main trunk to the various water outlets (kitchen, bath and water heater). The only time copper is used is where the plumbing and fixtures connect.
.