100

4.86263

4.30297

0.89423

2.55030

6.05564

0.55966

101

.

4.65825

0.89423

2.90558

6.41092

.

102

.

4.65825

1.05920

2.58226

6.73424

.

103

.

4.65825

1.20173

2.30290

7.01360

.

104

.

4.65825

1.32906

2.05334

7.26316

.

105

.

4.65825

1.44522

1.82568

7.49082

.

106

.

4.65825

1.55271

1.61500

7.70150

.

107

.

4.65825

1.65322

1.41799

7.89851

.

108

.

4.65825

1.74797

1.23229

8.08421

.

109

.

4.65825

1.83784

1.05615

8.26035

.

110

.

4.65825

1.92351

0.88823

8.42826

.

111

.

4.65825

2.00553

0.72748

8.58902

.

112

.

4.65825

2.08432

0.57305

8.74345

.

Obs

y

FORECAST

STD

L95

U95

RESIDUAL

Above is the forecast.  Below is a simulation of 112 obs.  I will check that my pred. intervals above capture the simulated value of y below.

Obs

y1

a1

i

a

y

99

3.92402

0.91613

99

1.11467

4.71493

100

4.71493

1.11467

100

0.54162

4.86263

101

4.86263

0.54162

101

0.26510

4.93632

102

4.93632

0.26510

102

0.59090

5.43353

103

5.43353

0.59090

103

0.41281

5.63752

104

5.63752

0.41281

104

-1.41192

4.07971

105

4.07971

-1.41192

105

-0.19314

4.38554

106

4.38554

-0.19314

106

2.34128

6.79508

107

6.79508

2.34128

107

-1.90089

4.06678

108

4.06678

-1.90089

108

1.02031

5.75886

109

5.75886

1.02031

109

1.19667

6.59495

110

6.59495

1.19667

110

0.67814

6.85019

111

6.85019

0.67814

111

-0.87939

5.73114

112

5.73114

-0.87939

112

-0.43383

5.60809