| Students examine a 5-ton gas rooftop unit. They identify all the component parts, check the wiring and the condensate drain. They confirm that the system has been installed per the manufacturer's specifications. | |
![]() |
![]() |
![]() |
![]() |
![]() |
Students examine the 5-ton unit with electric heat.![]() |
| A student works on the trainer board and attaches the compressor to add power and monitor it. | |
![]() |
![]() |
Another group of students have to find a missing wire before the power will turn on![]() |
And another student works an exercise on a board ![]() |
A student draws a schematic ![]() |
Another student discusses an air handler with the instructor![]() |












