Heating, Air Conditioning, & Refrigeration Technology

ACC Home | ACC Library | Contact us | Blackboard | Campus Location | Class Materials |

HART Home

Associate Of Applied Science Degree

Certificate Degree

Faculty/Staff

FAQ

Schedule

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Installation Manuals

all of these are in PDF format and require Adobe Acrobat Reader to view

1403 Air Conditioning Control Principles 2443 Industrial Air Conditioning - Carrier
1441 Residential Air Conditioning 2443 Industrial Air Conditioning - Marley
1445 Gas & Electric Heating 2443 Industrial Air Conditioning - TACO
2431-Advanced Electricity for HVAC 2443 Industrial Air Conditioning - Trane
2441-Commercial Air Conditioning 2445 Residential Air Conditioning Systems Design
2442 Commercial Refrigeration 2449 Heat Pumps

HART 1403 Air Conditioning Control Principles

Fasco Facts

Overload Protectors

Tecumseh Service Data

 

HART 1441 Residential Air Conditioning

Bacharach Stinger User Manual

Cooler-Freezer Simulator

Honeywell Air Cleaner

 

HART 1445 Gas & Electric Heating

#19 Honeywell Intermittent Pilot Retrofit Kit Y8610-H

#21 Heat Sequencers

#23 Installation Instructions for LPM-01 Conversion Kit

#23 Information Manual Power Vented Gas Furnace

#23 Installation & Operating Instructions

#23 Repair Parts

#26 Lennox Electric Furnace

# 33 Janitrol Horizontal Installer’s Manual (large file)

Honeywell Air Cleaner

Lennox part 1

Lennon part 2

User Information Manual Power Vented Gas Furnace

White Rodgers Installation Inst. Hot Surface Ignitor

 

HART 2431-Advanced Electricity for HVAC

#17 Lennox Two Speed Part 1

#17 Lennox Two Speed Part 2

#27 Carrier Central Air Conditioner

Gas Venting Tables Janitrol

Honeywell VisionPRO Thermostat

 

HART 2441-Commercial Air Conditioning

#9 Five Ton A/C with Electric Heat

#20 Twenty Ton Lennox Roof Top Package Unit

 

HART 2442 Commercial Refrigeration

#17 Universal Ice Cream Freezer

#27 Ice-O-Matic Ice Flaker

 

HART 2443 Industrial Air Conditioning

Carrier

Installation Start-up and Service Instructions (large file)

Carrier Water Piping Systems & Pumps Part 1

Carrier Water Piping Systems & Pumps Part 2

Central Station Air Handling Equipment Part 1

Central Station Air Handling Equipment Part 2

Marley

Cooling Tower Inspection Tips

Marley Aquatower Cooling Tower

Super Aquatower

TACO

3008 Replacement Parts

ACCU FLO Balancing Valve

Air Separator

Circuit Setter Flow Balancing Valve

Commercial Hydronic Systems

Comparative Analysis

FE-FM Base Mounted Pumps

TA 0538 Replacement Parts

Frame-Mounted End Suction Pumps

Multi-Purpose Valve Instruction Sheet

Multi-Purpose Valve

Pump, Single Stage Double Suction

Pumps Tanks and Accessories

SD Suction Diffuser

System Pressurization And Expansion Control

TA Base Mounted Pumps

Trane

CenTraVac Starters Part 1

CenTraVac Starters Part 2

CVHE-IN-5 Installation Part 1

CVHE-IN-5 Part 2

CVHE-IN-5 Part 3

Engineering Bulletin CTV-EB-84

Installation Water Piping CVHE-IN-10C

Operation Maintenance CVHE-M-2C part 1

Operation CVHE-M-2C Part 2

Operation CVHE-M-2C Part 3

Purge Systems Operation

 

HART 2445 Residential Air Conditioning Systems Design

Hampden H-AP-2 Air Distribution System Trainer

 

HART 2449 Heat Pumps

Carrier Weather Maker

Heat Pumps Puron Split-System