Highland Phase 2

HLC2 Connection to HLC4000 Lower Level

Construction updates at Highland and Rio Grande: September 2020

Posted on Thu, 09/24/2020 - 11:41am

Highland Campus 2014 Bond Phase 2By Pamela Collier, ACC Highland Phase 2 Project ManagerThe Black Box Theatre wood floor is being installed. The wood stage flooring in the Music Performance Hall will be installed soon. The fixed seating in the...

Continue reading


Construction updates at Highland and Rio Grande: October 2019

Posted on Mon, 10/14/2019 - 1:01pm

Rio Grande Campus RenovationsBy: Paul Mason, Rio Grande Renovation Project Manager Work on Rio Grande Campus Building 1000 is proceeding along smoothly this month. ELECTRICALElectrical panel rough-in at the main electrical room is complete. HVAC...

Continue reading


ACC developing new incubator to fuel job growth and talent pipeline in Austin’s growing manufacturing industry

Posted on Wed, 09/25/2019 - 2:41pm

Austin Community College (ACC) is developing the college’s third incubator at ACC Highland to nurture businesses and grow a talent pipeline in Austin’s $12.3 billion manufacturing industry. A third of major employers in Central Texas are...

Continue reading


Construction updates at Highland and Rio Grande: August 2019

Posted on Fri, 08/16/2019 - 4:48pm

What's new at Highland Phase 2?By: Pamela Collier, ACC Highland Phase 2 Project Manager All aspects of construction have progressed as the building is large and in various stages of construction from one end to the other. Exterior curtainwall,...

Continue reading


Crews continue renovation work at ACC Highland Phase 2 and Rio Grande Campus

Posted on Tue, 07/09/2019 - 12:00pm

ACC Highland Phase 2 Construction crews continue to work over the summer on the Highland Campus Phase 2 renovation project, including waterproofing exterior openings, pouring sound slabs and ramps, open stair steel installation, and reinstalling...